News
    Contact US
XIN YUE FENG SHIPYARD LTD.
Add: Jinmen Industrial Park, Shadui Town, Xinhui District, Jiangmen City, China (529147)
Tel: +86-750-6232780
Fax: +86-750-6232781
GM: Mr. Luo Ting
E-mail:luoting@xyfshipyard.com
Chairman:Mr. Luo Chaoneng
E-mail:cn.luo@xyfshipyard.com
XYF Shipyard (Australia) Pty Ltd
Director:Steven Liu
Mobile:0411 369 333
E-mail:steven.liu@xyfshipyard.com
 
news
56.2m Supply Vessel DP1/XYF218 (MUTAWA 301) Was Delivered Successfully
2013-07-05
On Jul. 5, 2013, the 56.2m Supply Vessel DP1 / XYF218 built by Xin Yue Feng Shipyard Ltd was delivered to the owner successfully.The vessel was built under the survey of BUREAU VERITAS with the notation: I + Hull + Mach; Tug ; Supply vessel ; Fire fighting ship 1; Water Spraying; Special service - Anchor Handling; Unrestricted navigation; +DYNAPOS -AM/AT. Two 2040KW @ 1000RPM WARTSILA main engines were equipped, and one bow thruster and one stern thruster were fitted for the powerful capacity of positioning. Three 400KW Caterpillar main generator sets were installed on board, and two 1000KW shaft generators driven by main engines supply the power to the bow and stern thrusters.The vessel measures 56.2M in length, with a moulded breadth of 14.2M, and a moulded depth of 5.5M. The maximum draught is 4.50 M. The vessel can carry 40 men, 590M3 of fuel oil, 555M3 of fresh water, 212M3 of dry bulk. Equipped with a 150-tonne line pull winch, XYF218 can achieve the bollard pull of 65T and a speed of 12.5 knots.
 
Main characteristics:
Length overall                                               56.20 m
Length waterline                                           54.00 m
Length between perpendiculars                      50.97 m
Breadth moulded                                           14.20 m
Depth moulded                                             5.50 m
Draft design / Max. draft                                 4.30 m / 4.50 m
Complement                                                 40 men
Fuel oil                                                         590.0 m3
Fresh water                                                  555.0 m3
Drill/Sea water ballast                                     150.0 m3
Mud                                                            95.0 m3
Brine                                                           60.0 m3
Dry Bulk Cement                                           212.4 m3
Foam                                                           7.6 m3
Lub Oil                                                         4.5 m3
Hydraulic Oils                                                10.0 m3
Dirty Oil                                                        6.6 m3
Sewage Holding                                            8.2 m3
Prev:The Keel-laying Ceremony of 60.8m A.H. Tug/ Supply Vessel(DP2) XYF238
Next:56.2m Supply Vessel DP1/XYF218 Finished Official Sea Trial Successfully
Copyright © 2012 XIN YUE FENG SHIPYARD LTD. ALL Rights Reserved 备案号:粤ICP备18114874号