News
    Contact US
XIN YUE FENG SHIPYARD LTD.
Add: Jinmen Industrial Park, Shadui Town, Xinhui District, Jiangmen City, China (529147)
Tel: +86-750-6232780
Fax: +86-750-6232781
GM: Mr. Luo Ting
E-mail:luoting@xyfshipyard.com
Chairman:Mr. Luo Chaoneng
E-mail:cn.luo@xyfshipyard.com
XYF Shipyard (Australia) Pty Ltd
Director:Steven Liu
Mobile:0411 369 333
E-mail:steven.liu@xyfshipyard.com
 
news
The Keel-laying Ceremony of 60.80M Anchor Handling Tug/Supply Vessel(DP2)XYF127
2014-04-23
On Apr.23, 2014, the keel-laying ceremony of 60.80M Anchor Handling Tug / Supply Vessel (DP2) XYF127 was held in XIN YUE FENG SHIPYARD LTD. XYF127 is built under the survey of BV Class including the notations of [1 +HULL + MACH, Tug, Supply Vessel, Fire-Fighting Ship 1, Water Spraying, Special service, Anchor Handling SP40, + Dynapos AM/AT R, Unrestricted Navigation]. The designed bollard pull reaches 80T and the designed speed reaches 12.5 knots. The vessel measures 60.80M in length, with a moulded breadth of 16M, and a moulded depth of 6.5M. The maximum draught is 5.3M. The vessel can carry 40 men, 580M3 of fuel oil, 500M3 drill water, 300M3 of fresh water, 170M3 of dry bulk and 250M3 of mud.

 

Main characteristics:

Length overall                                               60.80 m

Length waterline                                           58.50 m

Length between perpendiculars                      53.10 m

Breadth moulded                                           16.00 m

Depth moulded                                             6.50 m

Draft design / Max. draft                                 5.30 m

Complement                                                 40 men

Fuel oil                                                         580.0 m3

Fresh water                                                  300.0 m3

Drill/Sea water ballast                                     500.0 m3

Liquid Mud/ Brine                                           250.0 m3

Dry Bulk                                                       170m3

Foam                                                           12 m3

Prev:The Keel-laying Ceremony of 60.80M Supply Vessel (DP2) XYF125
Next:58.50m Supply Vessel DP1/XYF115 (VM PIONEER) Was Delivered Successfully
Copyright © 2012 XIN YUE FENG SHIPYARD LTD. ALL Rights Reserved 备案号:粤ICP备18114874号