News
    Contact US
XIN YUE FENG SHIPYARD LTD.
Add: Jinmen Industrial Park, Shadui Town, Xinhui District, Jiangmen City, China (529147)
Tel: +86-750-6232780
Fax: +86-750-6232781
GM: Mr. Luo Ting
E-mail:luoting@xyfshipyard.com
Chairman:Mr. Luo Chaoneng
E-mail:cn.luo@xyfshipyard.com
XYF Shipyard (Australia) Pty Ltd
Director:Steven Liu
Mobile:0411 369 333
E-mail:steven.liu@xyfshipyard.com
 
news
The Launching Ceremony for 58.6m Supply Vessel DP1/XYF219
2012-10-26
On Oct 30th 2012,Xin Yue Feng Shipyard Ltd. launched its 58.6m Supply Vessel DP1/XYF219, and a warm ceremony was held at the shipyard’s drydock#1. XYF219 was ordered by a Middle East ship owner, who had placed another two 56.2m CPP-A.H./TUG S.V(XYF218 &XYF222) under building at the yard. The shipyard’s management team, representative and marine engineer of the ship owner, BV surveyors and other guests from related companies attended the ceremony. Everyone witnessed the perfect moment!
Main characteristics:
Length overall                                               58.60 m
Length waterline                                           56.33 m
Length between perpendiculars                      50.97 m
Breadth moulded                                           14.20 m
Depth moulded                                             5.50 m
Draft design / Max. draft                                 4.30 m / 4.50 m
Complement                                                 40 men
Fuel oil                                                         600.0 m3
Fresh water                                                  600.0 m3
Drill/Sea water ballast                                     100.0 m3
Mud                                                            120.0 m3
Brine                                                           80.0 m3
Dry Bulk Cement                                           212.4 m3
Foam                                                           7.6 m3
Lub Oil                                                         3.3 m3
Hydraulic Oils                                                10.5 m3
Dirty Oil                                                        6.6 m3
Sewage Holding                                            8.2 m3
Prev:58.6m Supply Vessel DP1/XYF219 Finished Sea Trial Successfully
Next:The Foundation Laying Ceremony for A New Fabrication Shop, A Pipe Shop and A Out
Copyright © 2012 XIN YUE FENG SHIPYARD LTD. ALL Rights Reserved 备案号:粤ICP备18114874号